Overview
A tower site is as much a ground-level build as a vertical one — the compound has to hold equipment cabinets, carry grounding current safely to earth, keep gravel graded for drainage, and keep the fence line where the lease and the site plan say it goes. We build that side of the job to the same documentation standard as the structure above it.
This is often the scope that gets added on to an erection or antenna job once a GC realizes the compound needs work too — we run it standalone or bundled with tower work on the same mobilization.
What's Included
- Perimeter chain-link fencing with barbed top guard, line posts and access gate per site plan
- Gravel ballast placement and compound grading for drainage
- Ice bridge and cable tray installation between equipment and tower base
- H-frame and equipment cabinet pad installation
- Grounding ring and ground bar installation, bonded per site ground plan
- Access road and gate hardware per lease and site plan requirements
- Compound cleanup and final grading at closeout